
Large-Airflow Shipyard Coating RTO
Confidential industrial project | Heavy Machinery & Shipbuilding
Project brief
Treatment context
Challenge
Collect and treat very large, distributed coating airflow.
Solution
A large-capacity three-bed RTO was documented for shipyard coating duty.
Documented outcomes
- 150,000 m³/h reference airflow
- Heavy-industry coating application
- Legacy project data retained without overstating current scope

Image note
Representative three-bed RTO equipment.
The image illustrates the relevant equipment family. It is not presented as a project-site photograph unless explicitly stated.
Evaluate this configuration for your line
Send your airflow, VOC composition, concentration range and operating schedule for an engineering review.